Featured · Energy & utilities
A hydro facility facing repeated FERC permit violations
The problem: Control room operators were setting water flow from gauge data about two hours downstream, and the facility kept breaching its license limits.
What we did: We studied the license, engineering data, and water-flow timing tests, interviewed operators, licensing staff, and fish biologists, then built new control room procedures with the operators based on real-time set points.